Holy Cow this thing will be here in a couple of weeks!
I hope there won't be a brawl for barn space and lift time.
Folks, I am sorry for not keeping closer to this thread...I have had my head buried under hoods to try and reduce the number of cars that are already here.
Start time: 9:00am
There should be room for three longer term projects like timing belts
in the barn. If you are a new-be make sure you have assistance and tools before you get started.
No major work started after 4:00pm -- I want to start winding this up around 9:00pm
Please, nothing like rear axle trailing arm bushing replacement .
Those can wind up being a hand full.
If you will be changing fluids bring containers to take them back with you for disposal.
As far as requests for chipping ...that will be handled by Jeff Robertson in the manner which he chooses. From past experience it has been on a first-come basis.
The main dish I will be providing will be pulled pork for sandwiches.
If you would like to bring a dish to pass around feel free but be prepared to take back what does not get eaten.
I will be providing bottled water, and some soda pops, juice.....
If there is some you like...BYO
WORK LIST:
If there is a list that has been started somewhere bump it up
Holy Cobra TB
tango 28 wheel bearing
new2diesel ball joint
GT2 brake bleed
PHDwannabe brake bleed, oil leak --taken care of already --I hope
TDIrapin skid plate
TDItran skid plate
Sprocket CAT filter conversion, hand brake cable
*Maybe on this----- 5th gear change on B4V --requires dropping the end of the trans or cutting chassis sheet metal out of the way for clearance
Paramedick B4 sway bar bushings --requires dropping the subframe and some one-time use hardware
Stinkyfingers Glueing letters on a hatch lid -- remember, John, don't start this one any later than 4pm ;}
to be continued....